• Home
  • Products
    • Gangways
      • Mariner I Gangways
      • Mariner II Gangways
    • Bridges
    • Floating Docks
    • Seawalls
    • Fixed Piers
    • Platforms
    • Specialty Items
  • About Us
  • Notable Projects
  • Contact Us
  • Careers
  • Payments
  • Meeco Sullivan
Steve Sullivan Retires After 38 Years

Steve Sullivan Retires After 38 Years

by kiaoihituabfkd9 | Feb 6, 2019 | Latest Press Releases

Warwick, NY— After helping lead and grow the company for the past 38 years, Meeco Sullivan announced Steve Sullivan’s retirement as President and CEO. Steve will continue to support and advise the company as a member of the Meeco Sullivan/Wahoo Advisory Board....
Steve Sullivan Retires After 38 Years

Suntex Marinas Chooses Meeco Sullivan for Vero Beach Marina Expansion

by kiaoihituabfkd9 | Oct 15, 2018 | Latest Press Releases

Senior VP of National Sales for Meeco Sullivan, announced the recent completion of the expansion at the Suntex Vero Beach Marina, which is part of Grand Harbor, Vero Beach’s largest upscale residential community on the Indian River and minutes from the Atlantic Ocean....
Steve Sullivan Retires After 38 Years

WindRiver Marina Puts Their Trust in Meeco Sullivan Again for Latest Expansion

by kiaoihituabfkd9 | May 24, 2018 | Latest Press Releases

McAlester, OK—Senior VP & Sales Manager for Meeco Sullivan announced the completion of the latest expansion at WindRiver Marina on Tellico Lake. WindRiver is a lakefront and golf community located minutes from Knoxville Tennessee. WindRiver selected Meeco Sullivan...
Next Entries »

Recent Posts

  • Celebrating Excellence: Warwick High School Rowing Crews Achieve Remarkable Season
  • Creating Accessible Horizons: CRAB & Meeco Sullivan Unite for Inclusive Dock Project
  • Project Spotlight: Great Oak Landing
  • Project Spotlight: Shinnecock Marina
  • Project Spotlight: Sportsman Marina

Recent Comments

No comments to show.

Meeco Facility
1501 E. Electric Ave.
McAlester, OK 74501

Sullivan Facility
3 Chancellor Lane
Warwick, NY 10990

Wahoo Facility
203 Chesterra, Dr.
Dahlonega, GA 30533

Ravens Facility
3295 Orange Ave.
Kissimmee, FL 34744

Copyright 2024 Ravens Marine . View Our Privacy Policy

×

Sullivan Light Duty Wave Wall

  • Constructed with Sullivan HD design
  • Metal connection brackets create stability and add strength
  • Diagonal steel reinforcement from wall leg to center beam
  • Stainless steel exterior lag bolts – prevent rust
  • Truss system hidden by 2”x10” outer members

Sullivan Wave Attenuators

  • Attenuator boxes
  • 5 timber beams or 7 timber beams tall
  • Frames built from (2) 2”x10” laminated
    structural timber beams
  • Floats incorporated into upper frame

Five Timber Beams Fully Assembled

  • 3 sections connected by box-to-box connection plates
  • 6 bolt truss tabs tie WA box to upper frame, reinforced with outside washer plates

Attenuator Box

  • Diagonal wood bracing secures and
    strengthens box timber members
  • Inside steel legs bolt through to outside
    steel angle box legs

Galvanized Structural Steel Truss Frame

  • Struts along top and bottom
  • Diagonal struts tie box legs to truss and provides support for wall boards
  • Truss design creates torsional rigidity
  • Resists unforgiving wave action

5 Timber Member WA w/ Upper Frame & Decking

  • Splice block connection when wave attenuator is
    constructed of multiple boxes.
  • Steel angle outside box legs extended to connect to upper frame
  • Steel truss tabs between box legs connect to upper frame
  • Step leg design aligns splice member

Sullivan Wave Attenuator Assembly

Integrated truss tabs stick upwards to attach the box truss to the dock frame

Sullivan HD frame, constructed with 2”x10” beams and preinstalled floats, is attached to the top of the attenuator box

Tab to tab center brace reinforces beams on each side of box

Internal pile guides are built into the frame,
with pile rollers and decking installed last

Completed attenuator boxes prepared for shipping

How Sullivan Wave Attenuators Work

Attenuator walls and box truss sit mostly below water level

Sullivan HD timber frame and floats attach to the top of the boxes

Surface fully decked as a useable dock